Montage sur : AVEC ASSISTANT DE MAINTIEN SUR LA VOIE
A PARTIR DU 09/04/2018 JUSQU'AU 28/09/2020
ESSENCE SANS PLOMB
AVEC REGLAGE MANUEL A DISTANCE DES PROJECTEURS
CONTROLE ELECTRONIQUE DE STABILISATION (ESP)
AVEC BOUTON START ECLAIRE
CONDUITE A GAUCHE
Montage sur : AVEC ASSISTANT DE MAINTIEN SUR LA VOIE
A PARTIR DU 09/04/2018 JUSQU'AU 28/09/2020
ESSENCE SANS PLOMB
AVEC REGLAGE MANUEL A DISTANCE DES PROJECTEURS
CONTROLE ELECTRONIQUE DE STABILISATION (ESP)
sauf SAUF AVEC BOUTON START ECLAIRE
CONDUITE A GAUCHE